Skip to content
Kaulii

RPT-90003

Pacific Fiber Solutions · Fiber · WO-24435

82

out of 100

Proof Score™

Strong

Documentation quality for Fiber Drop Installation

Shared67% evidence completeGenerated by David Johnson
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • GPS unavailable — location could not be confirmed from the capture device.
  • Technician never stated their name on the recording.
  • Work order number was not spoken or shown on camera.
  • No before-state footage to compare against the completed work.

AI recommendations

  • Enable location services on the capture device before recording.
  • State your full name and role in the first 10 seconds.
  • Say the work order number out loud at the start of the walkthrough.
  • Capture the before-state next time before starting work.
Executive summary

Fiber work at 6448 Columbia Blvd, Sacramento, CA was completed and documented on site by David Johnson. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Fiber Drop Installation at 6448 Columbia Blvd, Sacramento, CA
  • Pulled and secured the fiber drop from the pedestal to the demarcation point
  • Fusion spliced the strands and seated them in a protected splice tray
  • OTDR tested the span end to end and recorded loss values on video
  • Labeled the drop, sealed the enclosure and restored the work area
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Single-mode drop cable
  • Fusion splice sleeves
  • Weatherproof splice enclosure
  • Cable ties and drop clamps
  • Labeling and identification tags
Equipment identified
  • Fusion splicer
  • OTDR and optical power meter
  • Fiber cleaver and cleaning kit
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • MediumExisting pedestal seal is degraded and allows moisture intrusion.
  • LowAccess panel hardware is worn and should be replaced at next visit.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24435. My name is David Johnson with Pacific Fiber Solutions. I'm at 6448 Columbia Blvd, Sacramento, CA for Fiber Drop Installation. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full fiber scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24435.

Evidence gallery
Supervisor review
Documentation qualityStrong
Evidence completeness67%
Customer readyYES
Claim readyYES
Warranty readyYES
Audit readyNO
Supervisor confidenceModerate
Timeline
Recording date2026-08-08
Time9:04 AM CDT
Recording duration4m 29s
Report generated2026-08-08 · report built in 52 seconds
Work orderWO-24435
CompanyPacific Fiber Solutions

30.2564° N, 97.7764° W

6448 Columbia Blvd, Sacramento, CA

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.