RPT-90011
Northstar Utilities · Gas · WO-24427
84
out of 100
Proof Score™
Strong
Documentation quality for Gas Meter Installation
Missing evidence
- ⚠ Final installation overview missing.
- ⚠ No follow-up recommendation was recorded.
AI recommendations
- “Record a wider overview of the completed installation.”
- “Record what should happen next and show final cleanup before leaving.”
Gas work at 9646 Del Paso Blvd, Minneapolis, MN was completed and documented on site by Carlos Fuentes. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.
- Completed Gas Meter Installation at 9646 Del Paso Blvd, Minneapolis, MN
- Shut off and locked out the service before beginning work
- Installed the meter set and regulator with correct clearances
- Leak tested all joints with soap solution and a calibrated detector
- Relit and verified appliance operation before leaving the site
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- Gas meter and regulator
- Yellow coated service piping
- Approved thread sealant
- Riser supports and bollard hardware
- Labeling and identification tags
- Combustible gas detector
- Manometer
- Pipe wrenches and threading dies
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- MediumService riser coating is chipped at grade and should be recoated.
- LowAccess panel hardware is worn and should be replaced at next visit.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24427. My name is Carlos Fuentes with Northstar Utilities. I'm at 9646 Del Paso Blvd, Minneapolis, MN for Gas Meter Installation. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full gas scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24427.
30.2460° N, 97.7660° W
9646 Del Paso Blvd, Minneapolis, MN
Timestamp verified at capture