RPT-90156
Apex Utility Services · Electrical · WO-24282
79
out of 100
Proof Score™
Acceptable
Documentation quality for Meter Upgrade
Missing evidence
- ⚠ Safety PPE not shown at any point in the walkthrough.
- ⚠ No close-up of the primary installed equipment.
- ⚠ No follow-up recommendation was recorded.
AI recommendations
- “Show PPE and lockout/tagout before opening any panel.”
- “Retake a close-up of the installed equipment nameplate.”
- “Record what should happen next and show final cleanup before leaving.”
Electrical work at 1463 Stemmons Fwy, Phoenix, AZ was completed and documented on site by Wesley Grant. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.
- Completed Meter Upgrade at 1463 Stemmons Fwy, Phoenix, AZ
- Isolated the feeder and verified zero energy before opening the enclosure
- Replaced failed components and re-landed conductors on labeled terminations
- Performed insulation resistance and continuity testing on affected circuits
- Restored power and confirmed balanced phase loading at the panel
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- Breakers and terminal lugs
- THHN conductor and conduit fittings
- Panel schedule labels
- Anti-oxidant compound
- Labeling and identification tags
- Insulation resistance tester
- Clamp meter and thermal camera
- Torque screwdriver set
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- LowAdjacent breaker shows heat discoloration and should be evaluated at the next service window — noted for monitoring only.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24282. My name is Wesley Grant with Apex Utility Services. I'm at 1463 Stemmons Fwy, Phoenix, AZ for Meter Upgrade. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full electrical scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24282.
30.2513° N, 97.7713° W
1463 Stemmons Fwy, Phoenix, AZ
Timestamp verified at capture
Scan to open the live online version of this report. Included on the branded PDF.
