RPT-90162
Blue Peak Plumbing · Plumbing · WO-24276
91
out of 100
Proof Score™
Strong
Documentation quality for Sewer Lateral Repair
AI recommendations
- “Documentation is complete — no additional capture required before invoicing.”
Plumbing work at 2277 Brighton Blvd, Boise, ID was completed and documented on site by Derek Chan. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.
- Completed Sewer Lateral Repair at 2277 Brighton Blvd, Boise, ID
- Isolated the affected branch and verified no residual pressure
- Removed the failed assembly and installed the replacement to code
- Pressure tested the repair and checked for leaks at all joints
- Restored service and confirmed flow and drainage at the fixtures
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- Backflow preventer assembly
- Copper and PVC fittings
- Pipe dope and thread sealant
- Hangers and supports
- Labeling and identification tags
- Press tool and jaws
- Pressure test kit
- Drain inspection camera
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- LowShutoff valve upstream of the repair is stiff and should be replaced — noted for monitoring only.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24276. My name is Derek Chan with Blue Peak Plumbing. I'm at 2277 Brighton Blvd, Boise, ID for Sewer Lateral Repair. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full plumbing scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24276.
30.2537° N, 97.7737° W
2277 Brighton Blvd, Boise, ID
Timestamp verified at capture