Skip to content
Kaulii

RPT-90174

Blue Peak Plumbing · Water · WO-24264

71

out of 100

Proof Score™

Acceptable

Documentation quality for Water Valve Replacement

Shared58% evidence completeGenerated by Marcus Ivey
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • Capture timestamp could not be verified against device metadata.
  • Technician never stated their name on the recording.
  • No close-up of the primary installed equipment.
  • Narration does not explain what work was actually completed.
  • No follow-up recommendation was recorded.

AI recommendations

  • Record directly in the app so the timestamp is signed at capture.
  • State your full name and role in the first 10 seconds.
  • Retake a close-up of the installed equipment nameplate.
  • Add 20 seconds of plain-language narration describing the completed work.
  • Record what should happen next and show final cleanup before leaving.
Executive summary

Water work at 8167 Industrial Blvd, Boise, ID was completed and documented on site by Marcus Ivey. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Water Valve Replacement at 8167 Industrial Blvd, Boise, ID
  • Located and excavated to expose the failed valve section
  • Isolated the main, cut out the damaged section and installed the replacement valve
  • Pressure tested the repair and flushed the line until clear
  • Backfilled, compacted and restored the surface to grade
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Ductile iron gate valve
  • Repair couplings and gaskets
  • Bedding sand and compactable backfill
  • Valve box and lid
  • Labeling and identification tags
Equipment identified
  • Mini excavator
  • Pipe cutter and torque wrench
  • Pressure test gauge
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • LowAdjacent pipe section shows external corrosion and should be monitored — noted for monitoring only.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24264. My name is Marcus Ivey with Blue Peak Plumbing. I'm at 8167 Industrial Blvd, Boise, ID for Water Valve Replacement. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full water scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24264.

Evidence gallery
Supervisor review
Documentation qualityAcceptable
Evidence completeness58%
Customer readyNO
Claim readyNO
Warranty readyNO
Audit readyNO
Supervisor confidenceLow
Timeline
Recording date2026-06-26
Time10:53 AM CDT
Recording duration5m 48s
Report generated2026-06-26 · report built in 53 seconds
Work orderWO-24264
CompanyBlue Peak Plumbing

30.2473° N, 97.7673° W

8167 Industrial Blvd, Boise, ID

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.