RPT-90253

Blue Peak Plumbing · Plumbing · WO-24185

84

out of 100

Proof Score™

Strong

Documentation quality for Sewer Lateral Repair

Shared83% evidence completeGenerated by Travis Boone
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • Final installation overview missing.
  • Safety PPE not shown at any point in the walkthrough.

AI recommendations

  • Record a wider overview of the completed installation.
  • Show PPE and lockout/tagout before opening any panel.
Executive summary

Plumbing work at 4493 Lakeshore Dr, Boise, ID was completed and documented on site by Travis Boone. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Sewer Lateral Repair at 4493 Lakeshore Dr, Boise, ID
  • Isolated the affected branch and verified no residual pressure
  • Removed the failed assembly and installed the replacement to code
  • Pressure tested the repair and checked for leaks at all joints
  • Restored service and confirmed flow and drainage at the fixtures
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Backflow preventer assembly
  • Copper and PVC fittings
  • Pipe dope and thread sealant
  • Hangers and supports
  • Labeling and identification tags
Equipment identified
  • Press tool and jaws
  • Pressure test kit
  • Drain inspection camera
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • LowShutoff valve upstream of the repair is stiff and should be replaced — noted for monitoring only.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24185. My name is Travis Boone with Blue Peak Plumbing. I'm at 4493 Lakeshore Dr, Boise, ID for Sewer Lateral Repair. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full plumbing scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24185.

Evidence gallery
Supervisor review
Documentation qualityStrong
Evidence completeness83%
Customer readyYES
Claim readyYES
Warranty readyYES
Audit readyNO
Supervisor confidenceModerate
Timeline
Recording date2026-06-04
Time10:49 AM CDT
Recording duration4m 44s
Report generated2026-06-04 · report built in 49 seconds
Work orderWO-24185
CompanyBlue Peak Plumbing

30.2489° N, 97.7689° W

4493 Lakeshore Dr, Boise, ID

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.