Skip to content
Kaulii

RPT-90282

Evergreen Construction · General Construction · WO-24156

99

out of 100

Proof Score™

Excellent

Documentation quality for Conduit Boring

Shared100% evidence completeGenerated by Andre Coleman
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

AI recommendations

  • Documentation is complete — no additional capture required before invoicing.
Executive summary

General Construction work at 4782 Maple Grove Ln, Portland, OR was completed and documented on site by Andre Coleman. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.

Work completed
  • Completed Conduit Boring at 4782 Maple Grove Ln, Portland, OR
  • Established traffic control and verified underground locates before excavation
  • Completed the bore/excavation to the specified depth and alignment
  • Installed conduit and vault sections and proofed all runs
  • Backfilled, compacted and restored the surface to specification
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • HDPE conduit and couplers
  • Precast vault sections
  • Warning tape and tracer wire
  • Aggregate backfill and cold patch
  • Labeling and identification tags
Equipment identified
  • Directional boring rig
  • Compaction plate
  • Locator and depth probe
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • LowExisting conduit stub encountered mid-run required a minor alignment change — noted for monitoring only.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24156. My name is Andre Coleman with Evergreen Construction. I'm at 4782 Maple Grove Ln, Portland, OR for Conduit Boring. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full general construction scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24156.

Evidence gallery
Supervisor review
Documentation qualityExcellent
Evidence completeness100%
Customer readyYES
Claim readyYES
Warranty readyYES
Audit readyYES
Supervisor confidenceHigh
Timeline
Recording date2026-05-27
Time10:05 AM CDT
Recording duration5m 15s
Report generated2026-05-27 · report built in 47 seconds
Work orderWO-24156
CompanyEvergreen Construction

30.2545° N, 97.7745° W

4782 Maple Grove Ln, Portland, OR

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.