Skip to content
Kaulii

RPT-90347

Blue Peak Plumbing · Plumbing · WO-24091

77

out of 100

Proof Score™

Acceptable

Documentation quality for Sewer Lateral Repair

Shared58% evidence completeGenerated by Tyler White
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • Portions of the footage are motion-blurred and unusable as evidence.
  • Capture timestamp could not be verified against device metadata.
  • Safety PPE not shown at any point in the walkthrough.
  • No close-up of the primary installed equipment.
  • Narration does not explain what work was actually completed.

AI recommendations

  • Re-record the unclear segments with the camera held steady for 5 seconds per shot.
  • Record directly in the app so the timestamp is signed at capture.
  • Show PPE and lockout/tagout before opening any panel.
  • Retake a close-up of the installed equipment nameplate.
  • Add 20 seconds of plain-language narration describing the completed work.
Executive summary

Plumbing work at 4340 Hillcrest Dr, Boise, ID was completed and documented on site by Tyler White. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Sewer Lateral Repair at 4340 Hillcrest Dr, Boise, ID
  • Isolated the affected branch and verified no residual pressure
  • Removed the failed assembly and installed the replacement to code
  • Pressure tested the repair and checked for leaks at all joints
  • Restored service and confirmed flow and drainage at the fixtures
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Backflow preventer assembly
  • Copper and PVC fittings
  • Pipe dope and thread sealant
  • Hangers and supports
  • Labeling and identification tags
Equipment identified
  • Press tool and jaws
  • Pressure test kit
  • Drain inspection camera
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • LowShutoff valve upstream of the repair is stiff and should be replaced — noted for monitoring only.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24091. My name is Tyler White with Blue Peak Plumbing. I'm at 4340 Hillcrest Dr, Boise, ID for Sewer Lateral Repair. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full plumbing scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24091.

Evidence gallery
Supervisor review
Documentation qualityAcceptable
Evidence completeness58%
Customer readyYES
Claim readyNO
Warranty readyYES
Audit readyNO
Supervisor confidenceModerate
Timeline
Recording date2026-05-11
Time10:21 AM CDT
Recording duration3m 46s
Report generated2026-05-11 · report built in 51 seconds
Work orderWO-24091
CompanyBlue Peak Plumbing

30.2441° N, 97.7641° W

4340 Hillcrest Dr, Boise, ID

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.