RPT-90528
Evergreen Construction · Roofing · WO-24348
77
out of 100
Proof Score™
Acceptable
Documentation quality for Roof Repair
Missing evidence
- ⚠ Portions of the footage are motion-blurred and unusable as evidence.
AI recommendations
- “Re-record the unclear segments with the camera held steady for 5 seconds per shot.”
Roofing work at 4048 Maple Grove Ln, Portland, OR was completed and documented on site by Bryce Whitaker. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.
- Completed Roof Repair at 4048 Maple Grove Ln, Portland, OR
- Removed damaged membrane and inspected the deck for saturation
- Installed new insulation board and membrane patch with heat weld
- Sealed penetrations, flashings and terminations
- Flood-checked drainage and cleared debris from drains
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- TPO membrane and cover board
- Termination bar and sealant
- Fasteners and plates
- Walk pad sections
- Labeling and identification tags
- Hot air welder
- Moisture meter
- Seam probe and roller
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- LowRoof drain strainer is cracked and should be replaced — noted for monitoring only.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24348. My name is Bryce Whitaker with Evergreen Construction. I'm at 4048 Maple Grove Ln, Portland, OR for Roof Repair. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full roofing scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24348.
30.2597° N, 97.7797° W
4048 Maple Grove Ln, Portland, OR
Timestamp verified at capture
Scan to open the live online version of this report. Included on the branded PDF.
