Metro Energy Contractors · Gas · WO-24234

94

out of 100

Proof Score™

Excellent

Documentation quality for Gas Line Repair

Shared100% evidence completeGenerated by Nina Petrov
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

AI recommendations

  • Documentation is complete — no additional capture required before invoicing.
Executive summary

Gas work at 4281 Columbia Blvd, Chicago, IL was completed and documented on site by Nina Petrov. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.

Work completed
  • Completed Gas Line Repair at 4281 Columbia Blvd, Chicago, IL
  • Shut off and locked out the service before beginning work
  • Installed the meter set and regulator with correct clearances
  • Leak tested all joints with soap solution and a calibrated detector
  • Relit and verified appliance operation before leaving the site
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Gas meter and regulator
  • Yellow coated service piping
  • Approved thread sealant
  • Riser supports and bollard hardware
  • Labeling and identification tags
Equipment identified
  • Combustible gas detector
  • Manometer
  • Pipe wrenches and threading dies
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • MediumService riser coating is chipped at grade and should be recoated.
  • LowAccess panel hardware is worn and should be replaced at next visit.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24234. My name is Nina Petrov with Metro Energy Contractors. I'm at 4281 Columbia Blvd, Chicago, IL for Gas Line Repair. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full gas scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24234.

Evidence gallery
Supervisor review
Documentation qualityExcellent
Evidence completeness100%
Customer readyYES
Claim readyYES
Warranty readyYES
Audit readyYES
Supervisor confidenceHigh
Timeline
Recording date2026-02-24
Time11:38 AM CDT
Recording duration5m 48s
Report generated2026-02-24 · report built in 44 seconds
Work orderWO-24234
CompanyMetro Energy Contractors

30.2418° N, 97.7618° W

4281 Columbia Blvd, Chicago, IL

Timestamp verified at capture