RPT-90701

Pacific Fiber Solutions · Telecom · WO-24175

74

out of 100

Proof Score™

Acceptable

Documentation quality for Cabinet Node Installation

Ready58% evidence completeGenerated by Dana Whitfield
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • Portions of the footage are motion-blurred and unusable as evidence.
  • Work order number was not spoken or shown on camera.
  • No close-up of the primary installed equipment.
  • Narration does not explain what work was actually completed.
  • No follow-up recommendation was recorded.

AI recommendations

  • Re-record the unclear segments with the camera held steady for 5 seconds per shot.
  • Say the work order number out loud at the start of the walkthrough.
  • Retake a close-up of the installed equipment nameplate.
  • Add 20 seconds of plain-language narration describing the completed work.
  • Record what should happen next and show final cleanup before leaving.
Executive summary

Telecom work at 3630 Ashland Ave, Sacramento, CA was completed and documented on site by Dana Whitfield. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Cabinet Node Installation at 3630 Ashland Ave, Sacramento, CA
  • Inspected and serviced the cabinet node and verified power to all cards
  • Cleaned optical connectors and reseated jumper terminations
  • Confirmed signal levels and alarm clearance with the network operations center
  • Secured the cabinet and documented the final configuration
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Optical jumpers
  • Rack hardware and cable management
  • Desiccant and cabinet seals
  • Port labels
  • Labeling and identification tags
Equipment identified
  • Optical power meter
  • Laptop with craft interface
  • Torque driver and connector cleaning kit
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • MediumCabinet cooling fan is running intermittently and should be replaced.
  • LowAccess panel hardware is worn and should be replaced at next visit.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24175. My name is Dana Whitfield with Pacific Fiber Solutions. I'm at 3630 Ashland Ave, Sacramento, CA for Cabinet Node Installation. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full telecom scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24175.

Evidence gallery
Supervisor review
Documentation qualityAcceptable
Evidence completeness58%
Customer readyNO
Claim readyNO
Warranty readyYES
Audit readyNO
Supervisor confidenceLow
Timeline
Recording date2026-02-09
Time11:30 AM CDT
Recording duration3m 10s
Report generated2026-02-09 · report built in 42 seconds
Work orderWO-24175
CompanyPacific Fiber Solutions

30.2410° N, 97.7610° W

3630 Ashland Ave, Sacramento, CA

Timestamp verified at capture