RPT-90730
Western Infrastructure · Water · WO-24146
82
out of 100
Proof Score™
Strong
Documentation quality for Water Main Repair
Missing evidence
- ⚠ GPS unavailable — location could not be confirmed from the capture device.
- ⚠ No close-up of the primary installed equipment.
- ⚠ Serial number not visible on any captured frame.
- ⚠ No follow-up recommendation was recorded.
AI recommendations
- “Enable location services on the capture device before recording.”
- “Retake a close-up of the installed equipment nameplate.”
- “Capture serial number labels close enough to read.”
- “Record what should happen next and show final cleanup before leaving.”
Water work at 1616 Prospect St, Salt Lake City, UT was completed and documented on site by Jose Martinez. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.
- Completed Water Main Repair at 1616 Prospect St, Salt Lake City, UT
- Located and excavated to expose the failed valve section
- Isolated the main, cut out the damaged section and installed the replacement valve
- Pressure tested the repair and flushed the line until clear
- Backfilled, compacted and restored the surface to grade
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- Ductile iron gate valve
- Repair couplings and gaskets
- Bedding sand and compactable backfill
- Valve box and lid
- Labeling and identification tags
- Mini excavator
- Pipe cutter and torque wrench
- Pressure test gauge
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- MediumAdjacent pipe section shows external corrosion and should be monitored.
- LowAccess panel hardware is worn and should be replaced at next visit.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24146. My name is Jose Martinez with Western Infrastructure. I'm at 1616 Prospect St, Salt Lake City, UT for Water Main Repair. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full water scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24146.
30.2466° N, 97.7666° W
1616 Prospect St, Salt Lake City, UT
Timestamp verified at capture
Scan to open the live online version of this report. Included on the branded PDF.