RPT-90837
Apex Utility Services · Electrical · WO-24039
91
out of 100
Proof Score™
Strong
Documentation quality for Electrical Panel Upgrade
Missing evidence
- ⚠ Technician never stated their name on the recording.
- ⚠ Safety PPE not shown at any point in the walkthrough.
AI recommendations
- “State your full name and role in the first 10 seconds.”
- “Show PPE and lockout/tagout before opening any panel.”
Electrical work at 7889 Marlow Ave, Phoenix, AZ was completed and documented on site by Nathan Reed. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.
- Completed Electrical Panel Upgrade at 7889 Marlow Ave, Phoenix, AZ
- Isolated the feeder and verified zero energy before opening the enclosure
- Replaced failed components and re-landed conductors on labeled terminations
- Performed insulation resistance and continuity testing on affected circuits
- Restored power and confirmed balanced phase loading at the panel
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- Breakers and terminal lugs
- THHN conductor and conduit fittings
- Panel schedule labels
- Anti-oxidant compound
- Labeling and identification tags
- Insulation resistance tester
- Clamp meter and thermal camera
- Torque screwdriver set
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- LowAdjacent breaker shows heat discoloration and should be evaluated at the next service window — noted for monitoring only.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24039. My name is Nathan Reed with Apex Utility Services. I'm at 7889 Marlow Ave, Phoenix, AZ for Electrical Panel Upgrade. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full electrical scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24039.
30.2565° N, 97.7765° W
7889 Marlow Ave, Phoenix, AZ
Timestamp verified at capture
Scan to open the live online version of this report. Included on the branded PDF.