RPT-90853
Pioneer Telecom Services · Fiber · WO-24023
84
out of 100
Proof Score™
Strong
Documentation quality for Fiber Drop Installation
AI recommendations
- “Documentation is complete — no additional capture required before invoicing.”
Fiber work at 8951 Maple Grove Ln, Omaha, NE was completed and documented on site by Sean Gallagher. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.
- Completed Fiber Drop Installation at 8951 Maple Grove Ln, Omaha, NE
- Pulled and secured the fiber drop from the pedestal to the demarcation point
- Fusion spliced the strands and seated them in a protected splice tray
- OTDR tested the span end to end and recorded loss values on video
- Labeled the drop, sealed the enclosure and restored the work area
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- Single-mode drop cable
- Fusion splice sleeves
- Weatherproof splice enclosure
- Cable ties and drop clamps
- Labeling and identification tags
- Fusion splicer
- OTDR and optical power meter
- Fiber cleaver and cleaning kit
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- MediumExisting pedestal seal is degraded and allows moisture intrusion.
- LowAccess panel hardware is worn and should be replaced at next visit.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24023. My name is Sean Gallagher with Pioneer Telecom Services. I'm at 8951 Maple Grove Ln, Omaha, NE for Fiber Drop Installation. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full fiber scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24023.
30.2474° N, 97.7674° W
8951 Maple Grove Ln, Omaha, NE
Timestamp verified at capture
Scan to open the live online version of this report. Included on the branded PDF.