RPT-90900
Apex Utility Services · Utility · WO-24414
91
out of 100
Proof Score™
Strong
Documentation quality for Pole Inspection
AI recommendations
- “Documentation is complete — no additional capture required before invoicing.”
Utility work at 2547 Brighton Blvd, Phoenix, AZ was completed and documented on site by Nathan Reed. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.
- Completed Pole Inspection at 2547 Brighton Blvd, Phoenix, AZ
- De-energized and grounded the primary conductors before removing the failed unit
- Removed and replaced the pole-mounted transformer with a like-for-like rated unit
- Re-terminated primary and secondary leads and torqued all connections to spec
- Re-energized and confirmed secondary voltage within tolerance under load
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- 25 kVA pole-mount transformer
- Primary and secondary connectors
- Grounding conductor and rods
- Silicone tape and weatherproofing
- Labeling and identification tags
- Bucket truck with insulated boom
- Hot sticks and grounding cluster
- Digital multimeter and phasing tester
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- LowCrossarm hardware shows surface corrosion and should be scheduled for replacement — noted for monitoring only.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24414. My name is Nathan Reed with Apex Utility Services. I'm at 2547 Brighton Blvd, Phoenix, AZ for Pole Inspection. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full utility scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24414.
30.2547° N, 97.7747° W
2547 Brighton Blvd, Phoenix, AZ
Timestamp verified at capture
Scan to open the live online version of this report. Included on the branded PDF.