Skip to content
Kaulii

RPT-90911

Summit Electrical Group · Utility · WO-24403

71

out of 100

Proof Score™

Acceptable

Documentation quality for Pole Inspection

Ready50% evidence completeGenerated by Chris Miller
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • Capture timestamp could not be verified against device metadata.
  • Technician never stated their name on the recording.
  • Work order number was not spoken or shown on camera.
  • Final installation overview missing.
  • Safety PPE not shown at any point in the walkthrough.
  • No follow-up recommendation was recorded.

AI recommendations

  • Record directly in the app so the timestamp is signed at capture.
  • State your full name and role in the first 10 seconds.
  • Say the work order number out loud at the start of the walkthrough.
  • Record a wider overview of the completed installation.
  • Show PPE and lockout/tagout before opening any panel.
  • Record what should happen next and show final cleanup before leaving.
Executive summary

Utility work at 6100 Marlow Ave, Denver, CO was completed and documented on site by Chris Miller. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Pole Inspection at 6100 Marlow Ave, Denver, CO
  • De-energized and grounded the primary conductors before removing the failed unit
  • Removed and replaced the pole-mounted transformer with a like-for-like rated unit
  • Re-terminated primary and secondary leads and torqued all connections to spec
  • Re-energized and confirmed secondary voltage within tolerance under load
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • 25 kVA pole-mount transformer
  • Primary and secondary connectors
  • Grounding conductor and rods
  • Silicone tape and weatherproofing
  • Labeling and identification tags
Equipment identified
  • Bucket truck with insulated boom
  • Hot sticks and grounding cluster
  • Digital multimeter and phasing tester
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • LowCrossarm hardware shows surface corrosion and should be scheduled for replacement — noted for monitoring only.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24403. My name is Chris Miller with Summit Electrical Group. I'm at 6100 Marlow Ave, Denver, CO for Pole Inspection. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full utility scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24403.

Evidence gallery
Supervisor review
Documentation qualityAcceptable
Evidence completeness50%
Customer readyNO
Claim readyNO
Warranty readyNO
Audit readyNO
Supervisor confidenceLow
Timeline
Recording date2025-12-16
Time12:27 AM CDT
Recording duration3m 22s
Report generated2025-12-16 · report built in 45 seconds
Work orderWO-24403
CompanySummit Electrical Group

30.2547° N, 97.7747° W

6100 Marlow Ave, Denver, CO

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.