Skip to content
Kaulii

RPT-90948

Pacific Fiber Solutions · Telecom · WO-24366

88

out of 100

Proof Score™

Strong

Documentation quality for Cabinet Node Installation

Shared83% evidence completeGenerated by David Johnson
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • Capture timestamp could not be verified against device metadata.
  • Safety PPE not shown at any point in the walkthrough.

AI recommendations

  • Record directly in the app so the timestamp is signed at capture.
  • Show PPE and lockout/tagout before opening any panel.
Executive summary

Telecom work at 1761 Grand Ave, Sacramento, CA was completed and documented on site by David Johnson. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Cabinet Node Installation at 1761 Grand Ave, Sacramento, CA
  • Inspected and serviced the cabinet node and verified power to all cards
  • Cleaned optical connectors and reseated jumper terminations
  • Confirmed signal levels and alarm clearance with the network operations center
  • Secured the cabinet and documented the final configuration
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Optical jumpers
  • Rack hardware and cable management
  • Desiccant and cabinet seals
  • Port labels
  • Labeling and identification tags
Equipment identified
  • Optical power meter
  • Laptop with craft interface
  • Torque driver and connector cleaning kit
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • LowCabinet cooling fan is running intermittently and should be replaced — noted for monitoring only.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24366. My name is David Johnson with Pacific Fiber Solutions. I'm at 1761 Grand Ave, Sacramento, CA for Cabinet Node Installation. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full telecom scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24366.

Evidence gallery
Supervisor review
Documentation qualityStrong
Evidence completeness83%
Customer readyYES
Claim readyYES
Warranty readyYES
Audit readyYES
Supervisor confidenceModerate
Timeline
Recording date2025-12-08
Time12:47 AM CDT
Recording duration5m 42s
Report generated2025-12-08 · report built in 47 seconds
Work orderWO-24366
CompanyPacific Fiber Solutions

30.2507° N, 97.7707° W

1761 Grand Ave, Sacramento, CA

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.