RPT-91032
Pacific Fiber Solutions · Telecom · WO-24282
86
out of 100
Proof Score™
Strong
Documentation quality for Cell Site Maintenance
AI recommendations
- “Documentation is complete — no additional capture required before invoicing.”
Telecom work at 2586 Foothill Pkwy, Sacramento, CA was completed and documented on site by David Johnson. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.
- Completed Cell Site Maintenance at 2586 Foothill Pkwy, Sacramento, CA
- Inspected and serviced the cabinet node and verified power to all cards
- Cleaned optical connectors and reseated jumper terminations
- Confirmed signal levels and alarm clearance with the network operations center
- Secured the cabinet and documented the final configuration
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- Optical jumpers
- Rack hardware and cable management
- Desiccant and cabinet seals
- Port labels
- Labeling and identification tags
- Optical power meter
- Laptop with craft interface
- Torque driver and connector cleaning kit
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- LowCabinet cooling fan is running intermittently and should be replaced — noted for monitoring only.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24282. My name is David Johnson with Pacific Fiber Solutions. I'm at 2586 Foothill Pkwy, Sacramento, CA for Cell Site Maintenance. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full telecom scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24282.
30.2461° N, 97.7661° W
2586 Foothill Pkwy, Sacramento, CA
Timestamp verified at capture
Scan to open the live online version of this report. Included on the branded PDF.
