Pioneer Telecom Services · Fiber · WO-24107

97

out of 100

Proof Score™

Excellent

Documentation quality for Aerial Fiber Splice

Ready100% evidence completeGenerated by Dominic Cruz
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

AI recommendations

  • Documentation is complete — no additional capture required before invoicing.
Executive summary

Fiber work at 2809 Industrial Blvd, Omaha, NE was completed and documented on site by Dominic Cruz. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.

Work completed
  • Completed Aerial Fiber Splice at 2809 Industrial Blvd, Omaha, NE
  • Pulled and secured the fiber drop from the pedestal to the demarcation point
  • Fusion spliced the strands and seated them in a protected splice tray
  • OTDR tested the span end to end and recorded loss values on video
  • Labeled the drop, sealed the enclosure and restored the work area
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Single-mode drop cable
  • Fusion splice sleeves
  • Weatherproof splice enclosure
  • Cable ties and drop clamps
  • Labeling and identification tags
Equipment identified
  • Fusion splicer
  • OTDR and optical power meter
  • Fiber cleaver and cleaning kit
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • LowExisting pedestal seal is degraded and allows moisture intrusion — noted for monitoring only.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24107. My name is Dominic Cruz with Pioneer Telecom Services. I'm at 2809 Industrial Blvd, Omaha, NE for Aerial Fiber Splice. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full fiber scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24107.

Evidence gallery
Supervisor review
Documentation qualityExcellent
Evidence completeness100%
Customer readyYES
Claim readyYES
Warranty readyYES
Audit readyYES
Supervisor confidenceHigh
Timeline
Recording date2025-09-30
Time12:07 AM CDT
Recording duration4m 32s
Report generated2025-09-30 · report built in 55 seconds
Work orderWO-24107
CompanyPioneer Telecom Services

30.2427° N, 97.7627° W

2809 Industrial Blvd, Omaha, NE

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.