RPT-91219
Evergreen Construction · General Construction · WO-24095
97
out of 100
Proof Score™
Excellent
Documentation quality for Vault Rehabilitation
AI recommendations
- “Documentation is complete — no additional capture required before invoicing.”
General Construction work at 1379 Copper Creek Rd, Portland, OR was completed and documented on site by Bryce Whitaker. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. All required evidence for customer approval, warranty and audit was captured.
- Completed Vault Rehabilitation at 1379 Copper Creek Rd, Portland, OR
- Established traffic control and verified underground locates before excavation
- Completed the bore/excavation to the specified depth and alignment
- Installed conduit and vault sections and proofed all runs
- Backfilled, compacted and restored the surface to specification
- Work area cleaned, debris removed and site secured
- Customer walkthrough narrated on camera for approval
- HDPE conduit and couplers
- Precast vault sections
- Warning tape and tracer wire
- Aggregate backfill and cold patch
- Labeling and identification tags
- Directional boring rig
- Compaction plate
- Locator and depth probe
- Kaulii mobile capture — GPS and timestamp signed at recording
- Lockout/tagout applied before any energized or pressurized work
- PPE worn throughout — eye protection, gloves, hard hat where required
- Work zone barricaded and signage posted
- Area cleared and secured before departure
- MediumExisting conduit stub encountered mid-run required a minor alignment change.
- LowAccess panel hardware is worn and should be replaced at next visit.
- 1Schedule a follow-up inspection within 90 days.
- 2Add this asset to the preventative maintenance rotation.
- 3Share this report with the property contact for approval.
Alright, this is work order WO-24095. My name is Bryce Whitaker with Evergreen Construction. I'm at 1379 Copper Creek Rd, Portland, OR for Vault Rehabilitation. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full general construction scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24095.
30.2408° N, 97.7608° W
1379 Copper Creek Rd, Portland, OR
Timestamp verified at capture