RPT-91266

Northstar Utilities · Gas · WO-24048

74

out of 100

Proof Score™

Acceptable

Documentation quality for Gas Meter Installation

Ready92% evidence completeGenerated by Marcus Bell
Video clarity
GPS verified
Timestamp verified
Technician identified
Work order identified
Installation clearly visible
Safety equipment documented
Equipment documented
Serial numbers captured
Before/After evidence
Work explanation
Recommended follow-up included

Missing evidence

  • Portions of the footage are motion-blurred and unusable as evidence.

AI recommendations

  • Re-record the unclear segments with the camera held steady for 5 seconds per shot.
Executive summary

Gas work at 5446 Ashland Ave, Minneapolis, MN was completed and documented on site by Marcus Bell. The technician captured a narrated walkthrough of the finished installation, confirmed all connections and equipment were in working order, and verified the work area was cleaned and secured before departure. A small number of evidence gaps were detected and are listed below.

Work completed
  • Completed Gas Meter Installation at 5446 Ashland Ave, Minneapolis, MN
  • Shut off and locked out the service before beginning work
  • Installed the meter set and regulator with correct clearances
  • Leak tested all joints with soap solution and a calibrated detector
  • Relit and verified appliance operation before leaving the site
  • Work area cleaned, debris removed and site secured
  • Customer walkthrough narrated on camera for approval
Materials mentioned
  • Gas meter and regulator
  • Yellow coated service piping
  • Approved thread sealant
  • Riser supports and bollard hardware
  • Labeling and identification tags
Equipment identified
  • Combustible gas detector
  • Manometer
  • Pipe wrenches and threading dies
  • Kaulii mobile capture — GPS and timestamp signed at recording
Safety observations
  • Lockout/tagout applied before any energized or pressurized work
  • PPE worn throughout — eye protection, gloves, hard hat where required
  • Work zone barricaded and signage posted
  • Area cleared and secured before departure
Issues found
  • MediumService riser coating is chipped at grade and should be recoated.
  • LowAccess panel hardware is worn and should be replaced at next visit.
Recommended follow-up
  1. 1Schedule a follow-up inspection within 90 days.
  2. 2Add this asset to the preventative maintenance rotation.
  3. 3Share this report with the property contact for approval.
Technician statement

Alright, this is work order WO-24048. My name is Marcus Bell with Northstar Utilities. I'm at 5446 Ashland Ave, Minneapolis, MN for Gas Meter Installation. I'm going to walk you through the completed work now. Here's the finished installation — you can see everything is mounted level and secured. Walking around the left side, all the connections are torqued and labeled. Here's the main equipment, and I'm getting a close-up of the nameplate so you have the model and serial on file. Safety-wise, I had lockout applied the whole time I was in the panel, PPE on, and the area was taped off. As far as the work completed, we handled the full gas scope, tested everything, and it's reading in range. One thing I did run into was some wear on the adjacent equipment — nothing that affects today's work but worth watching. For follow-up, I'd recommend an inspection in about 90 days. Here's a final overview of the completed job, cleaned up and ready for the customer. That's it for work order WO-24048.

Evidence gallery
Supervisor review
Documentation qualityAcceptable
Evidence completeness92%
Customer readyNO
Claim readyNO
Warranty readyYES
Audit readyNO
Supervisor confidenceLow
Timeline
Recording date2025-09-17
Time9:44 AM CDT
Recording duration5m 54s
Report generated2025-09-17 · report built in 50 seconds
Work orderWO-24048
CompanyNorthstar Utilities

30.2424° N, 97.7624° W

5446 Ashland Ave, Minneapolis, MN

Timestamp verified at capture

Scan to open the live online version of this report. Included on the branded PDF.